DHS BORDER STATION PORT OF ENTRY 

Pharr, TX - The General Service Administration awarded SAMES this contract for the construction of a new concrete pathway and access road.  SAMES furnished all labor, material, equipment, tools, transportation and management necessary for completion of the work. 

 

Construction of the new concrete roadway included erosion control, removal of the existing drain, installation of curb spill-wave with rock splash blocks to two new drains, and installation of K-rail on the west and east side.

The 4-foot wide concrete pathway led from the driver waiting area to the control room door and included 2 new trench drains along the walkway at the existing AC unit and drainage path to help direct drainage away from the

walking surface.

1/3
Project responsibilities and capabilities:
  • Planning and Scheduling

  • Construction Management

  • Traffic Control

  • Quality Control